project
                
                
            
        Wolfgang Meyer Sport Centre Hamburg-Stellingen
General information
- 
                        Location address
                        
Hamburg-Stellingen
 - 
                        Location country
                        
Germany
 - 
                        Year of construction
                        
1994
 - 
                        Name of the client/building owner
                        
Freie Hansestadt Hamburg
 - 
                        Function of building
                        
Sport
 - 
                        Degree of enclosure
                        
Open structure
 - 
                        Climatic zone
                        
Temperate - cold winters and mild summers
 - 
                        Number of layers
                        
mono-layer
 - 
                        Type of application of the membrane
                        
covering
 - 
                        Primary function of the tensile structure
                        
- Space defining elements
 
 
Description
                    The design of the 70 x 120 m wide and long membrane roof for an existing ice skating and cycling track was determined by low costs and short erection time (7 months including foundation work).
The primary structure consists of a pre-stressed membrane that is supported by piles and cables. Dependent on the stress, the cutting pattern of the membrane was aligned in radial and tangential stripes. Due to high translucency of the textile membrane the load paths are visible from underneath.                 
Description of the environmental conditions
Material of the cover
- 
                        Cable-net/Fabric/Hybrid/Foil
                        
Fabric
 - 
                        Type (code)
                        
IV
 
Main dimensions and form
- 
                        Covered surface (m2)
                        
7000
 - 
                        Maximum height (m)
                        
20
 - 
                        Total length (m)
                        
120
 - 
                        Total width (m)
                        
70
 - 
                        Form entire structure
                        
Anticlastic
 
Duration of use
- 
                        Temporary or permanent structure
                        
Permanent
 
Involved companies
- 
                        Architects
                                                                                
Silcher, Werner + Redante
 - 
                            Engineers
                                                                                   
schlaich bergermann partner
 - 
                            Contractors
                                                                                     
Koch Membranen
Pfeifer Seil- und Hebetechnik GMBH
 
Editor
- 
                        Editor
                        
Marijke M. Mollaert