• 01
  • 02
  • 03
  • 04
  • 05
  • 06

General information

  • Location address
    Jungfernsteg 2, 24340 Eckernförde, Germany
  • Location country
    Germany
  • Year of construction
    2014
  • Name of the client/building owner
    Penta Nord Immobilien GmbH & Co, Germany
  • Function of building
    Public spaces
  • Degree of enclosure
    Open structure
  • Climatic zone
    Temperate - cold winters and mild summers
  • Number of layers
    mono-layer
  • Type of application of the membrane
    attached
  • Primary function of the tensile structure
    • Space defining elements

Description

Context.
As part of the redevelopment of the old harbour in Eckernförde, the architectural firm Rimpf designed and built a new apartment block on the “Hafenspitze” (Harbour Point). The city administration also wanted to erect a new landmark for Eckernförde in this prominent spot. The maritime atmosphere of the new “Hafenspitze” quarter – with views of the Baltic Sea, the yacht harbour and the beach – made a textile membrane sail an obvious choice for an eye-catching architectural landmark.

Project.
Because 3dtex became involved in the project at an early stage, it was possible to work together with the architects in developing the shape of the sail. The design is based on two mirror-symmetrical four-point sails that appear to take on changing forms as one approaches the harbour by water or on land. The shape of the sail was subject to many different criteria in terms of its visual effect from a distance and the views it enabled from the individual balconies of the apartment block.
Particular attention was given to the dynamic lines and design details that serve to accentuate the sail’s overall form and objective.
The fabric used was a PTFE-based fibreglass from Verseidag (type III), which as expected, faded within approx. 5 weeks from its original brown colour to a brilliant white. All steel elements were hot-dip galvanized and painted, which required the nearly 24-m-long supporting pole to be segmented. The joints have been left visible and are not cladded, which is why they also needed to be designed with aesthetic considerations in mind.

Erection.
The construction was erected in two stages: the supporting pole was already erected in January 2014, but it was necessary to wait for warmer weather to install the membranes, in order to avoid damage caused by crinkles in cold weather. It took five days to add the membrane with additional re-tensioning procedures. A specially built tensioning tool enabled the 12-t tensioning force to be applied at the upper attachment point by means of two hydraulic cylinders. With this, the tensioning force could be precisely applied and controlled according to the specifications.

The building developer, the architect and as well the majority of the citizens of Eckernförde are fully satisfied with the result. With its expressive form, the membrane sail is not only representative for the new “Hafenspitze” (Harbour Point) area, but is also a new landmark for Eckernförde. [TensiNews 28]

Description of the environmental conditions

Material of the cover

  • Cable-net/Fabric/Hybrid/Foil
    Cable
  • Type (code)
    III
  • Material Fabric/Foil
    Glasfabric
  • Material coating
    PTFE

Main dimensions and form

  • Covered surface (m2)
    237
  • Form single element
    Anticlastic

Duration of use

  • Temporary or permanent structure
    Permanent

Involved companies

Editor